Menu

Welcome

The Finest Supporting the Bravest!

The purpose of the Fire Mechanics Section is to promote standardization of fire apparatus and equipment preventative maintenance, improve safety standards and practices, promote workshops, conferences, and seminars related to the purposes of this Section, and to promote cost savings through standardization of building and equipment purchasing and maintenance.

RECENT FIRE MECHANIC NEWS

Posted: Oct 11, 2016

Randall County (NM) Firefighters Receive Two Specialized Trucks

Randall County firefighters now have some new equipment to better protect the residents they serve. Texas A&M Forest Service is donating $15 million to fire departments across the state to update old equipment, gear and trucks. In October, about $300,000 was donated to both the Lake Tanglewood Volunteer Fire Department (VFD) and Randall County Fire Department, which they used to purchase two trucks.

In October, about $300,000 was donated to both the Lake Tanglewood Volunteer Fire Department (VFD) and Randall County Fire Department, which they used to purchase two trucks.

"This grant funds different areas, including [a fire] apparatus (that goes from small brush trucks to large brush trucks), fire engines and tanker trucks," Troy Ducheneaux, Texas A&M Forest Service Regional Fire Coordinator, said. 

Through the grant, Lake Tanglewood's VFD purchased a specialized brush truck that was needed to fight fires. 

"Lake Tanglewood was awarded a grant for a small brush truck which allows them to have a $100,000 worth of the grant," said Ducheneaux. "If they include what's called a compressed foam system, they can get an additional $20,000 on top of that and it will allow them to boost their abilities to fight fires in their response area." 

The Randall County Fire Department was also able to purchase a new fire engine. 

Before, they had a 20-year-old engine truck that needed about $10,000 worth of mechanical and engine repairs.

Read more
Posted: Oct 11, 2016

Fire Truck Photo of the Day-Alexis Tanker

Long Lake Township Fire-Rescue Traverse City, MI, tanker. Freightliner M2 cab and chassis; Cummins ISL9 350-hp engine; APR polypropylene 3,300-gallon wet side tank.

Read more
Posted: Oct 10, 2016

Dallas Fire-Rescue: Stations Not Up to Standard

 Of their 58 stations in the city, Dallas Fire-Rescue says 19 would not pass National Fire Protection Association standards. In a presentation prepared for the Public Safety Committee, the department is recommending $220 million in station improvements to be included in the city's 2017 bond program.
The 19 stations falling short of standards and in need of replacement are more than 50 years old, according to the department. Those stations suffer from problems such as space limitations, structural and infrastructural deterioration, and traffic situations which could affect response time.

Station #4 located downtown on Akard Street was built in 1951. Present day traffic on Akard makes it difficult to maneuver fire engines in and out of the stations.

Along with insufficient parking and foundation problems, the department estimates it will require $10.8 million to replace Station #4 alone.

Replacing all 19 stations would cost approximately $175 million, according to the department’s presentation. Four new fire stations and upgrades at the training center would account for the remainder of the $220 million that Dallas Fire-Rescue is recommending for 2017 bonds.

Since 1991, the city has replaced 14 stations total, built four new stations, and expanded one.

Read more
Posted: Oct 10, 2016

St. George (UT) Invests $2 Million in Three Fire Apparatus

With an aging fleet of fire engines and the fire-coverage needs of the city continuing to expand, the St. George City Council approved the leasing of three new fire engines Thursday. It adds to the new equipment and facilities the St. George Fire Department will be gaining in the near future.
The new fire engines, also referred to as pumper trucks, are being obtained through a four-year lease with an option to buy. In total, the cost of the lease is just over $2 million, with each pumper truck running $647,864. Interest on the lease is listed at 4.9 percent.

The three fire engines will take between 10-11 months to build, St. George Fire Chief Robert Stoker said. Once delivered, two of the new trucks will be put on front-line duty at fire stations in the areas of SunRiver and Dixie Downs.

The new pumper trucks will allow the Fire Department to retire trucks that have been in use since the 1970s, albeit they currently are on reserve.

An example of the fire engines being built to meet the city’s needs is that they will include additional storage space, Stoker said. The department tries to have as much equipment on one firetruck as possible when responding to an incident. That way they don’t end up pulling additional resources from elsewhere.

Equipment on fire trucks includes more than just that used to battling fires. Firefighters routinely respond to incidents involving medical emergencies, hazardous material spills and clean up and vehicle accidents that sometimes require special extrication equipment.

Read more
RSS
First38513852385338543856385838593860Last

Theme picker

Upcoming Events

Theme picker

Sponsors

Fire Mechanics Section Board

Chair

Posted: Oct 21, 2015

Chair

Elliot Courage
North Whatcom Fire & Rescue
Read more

Vice Chair

Posted: Oct 21, 2015

Vice Chair

Mike Smith 
Pierce County Fire District #5
Read more

Secretary

Posted: Oct 21, 2015

Secretary

Greg Bach
South Snohomish County Fire & Rescue
Read more

Director #1

Posted: Oct 21, 2015

Director #1

Doug Jones
South Kitsap Fire & Rescue
Read more

Director #2

Posted: Oct 21, 2015

Director #2

Paul Spencer 
Fire Fleet Maintenance LLC
Read more

Director #3

Posted: Oct 21, 2015

Director #3

Jim Morris
Mountain View Fire Department
Read more

Director #4

Posted: Oct 21, 2015

Director #4

Arnie Kuchta

Clark County Fire District 6

Read more

Director #6

Posted: Oct 21, 2015

Director #6

Brett Annear
Kitsap County Fire District 18
Read more

Director #5

Posted: Oct 21, 2015

Director #5

Jay Jacks
Camano Island Fire & Rescue
Read more

Legislative Representative

Posted: Oct 21, 2015

Legislative Representative

TBD
TBD
Read more

Immediate Past Chair

Posted: Oct 20, 2015

Immediate Past Chair

Brian Fortner
Graham Fire & Rescue

Read more
RSS

Theme picker

2020 CAR SHOW