Menu

Welcome

The Finest Supporting the Bravest!

The purpose of the Fire Mechanics Section is to promote standardization of fire apparatus and equipment preventative maintenance, improve safety standards and practices, promote workshops, conferences, and seminars related to the purposes of this Section, and to promote cost savings through standardization of building and equipment purchasing and maintenance.

RECENT FIRE MECHANIC NEWS

Posted: Jan 7, 2022

Photo of the Day: January 7, 2021

Toyne—North Boston (NY) Volunteer Fire Company two PRV XL pumpers. Spartan Metro Star cabs and chassis; Cummins L9 450-hp engines; Hale Qmax 1,500-gpm pumps; UPF Poly 1,000-gallon water tanks; Command Light 2 KL series light towers; Akron 34450 monitors with electric risers; welded stainless steel bodies. Dealer: Randy Smalley, Tri State Fire, Monogahela, PA.

MORE FIRE APPARATUS ARTICLES>>

Read more
Posted: Jan 6, 2022

St. Paul (IN) Volunteer Fire Department Waiting on New Station

The St. Paul (IN) Volunteer Fire Department has the land to build a new station but is waiting on construction funding, reports shelbynews.com.

The current building, located at 110 N. Webster St., was built in 1941 and lacks space for its five apparatus and has health issues, the report says.

The department tried applying for a grant, but COVID ixnayed those plans as well as many planned fundraisers.

The department has 23 volunteer firefighters on its roster, with about 10-12 who respond to fires.

Read more
Posted: Jan 6, 2022

Town of Dennis (MA) to Hold Ground Breaking for Fire Station 2

The Select Board invites all to a ground-breaking ceremony on January 13 at 11 a.m. to formally begin construction activities for the new Fire Station 2 project to be held onsite at 350 Paddocks Path, Dennis (MA).

At the Annual Town meeting held in June of 2020 the community approved the funding for Owner’ Project Manager (OPM), Design and Engineering services. Within six months an OPM and Designer had been selected. CHA Consulting, Inc. (OPM) and The Galante Architecture Studio (Design). The Dennis Fire Station 2 Committee was selected and added much input for the design of the future Fire Station as well as the selection of the General Contractor B.C. Construction Company, Inc.

Related Articles:
Special Town Meeting Scheduled for Potential New Dennis (MA) Fire Station
City of Dennis (MA) $14.6M Fire Station 2 Approved

Upon completion, the Dennis Fire Station 2 will provide proper coverage and sound response-time for the area as well as provide adequate capacity for Fire Department personnel, fire vehicles and equipment. The new facility, which was approved by a Town Meeting and subsequent ballot vote in November, 2021, is designed to meet the current and future needs of the Fire and Emergency Medical Services for the Town of Dennis Community.

If you are interested in learning more about the project, visit town.dennis.ma.us. Questions on the project can also be sent to Assistant Town Administrator, Gregory Rounseville at 508-760-6164 or grounseville@town.dennis.ma.us

Read more
Posted: Jan 6, 2022

Ceremony to Open New Broken Arrow (OK) Fire Station 7 Set for Jan. 12

The City of Broken Arrow (OK) will officially open a new Fire Station #7 with an unusual ribbon-cutting ceremony on Jan. 12, at 2 p.m. The new station is located on the southeast corner of Washington Street and 1st Place, just south of Arrowhead Park, at 201 E. Washington St.

The City of Broken Arrow will officially open a new Fire Station #7 with an unusual ribbon-cutting ceremony on Jan. 12, at 2 p.m. The new station is located on the southeast corner of Washington Street and 1st Place, just south of Arrowhead Park, at 201 E. Washington St. 

This new Station #7 replaces the 50-year-old Fire Station #7 currently located on South Elm Place and Edgewater Street.  

Fire station dedications typically use a Fire Hose Ceremony with coupled firehoses. By separating the hoses, it’s their way of cutting the ribbon. Mayor Debra Wimpee, members of the City Council, Fire Chief Jeremy Moore, City Manager Michael Spurgeon, and other City leaders will be on-hand for the event.

The new station is more than 12,000 square feet and includes:

• Eight modern semi-private bunk rooms

• Four large bays to accommodate modern equipment

• Two Captain’s bunks and offices

• A battalion Chief Bunk and office

• A commons area

• Physical fitness space

• A public restroom 

The location is consistent with the City’s research which indicated the best areas for ideal response times for assisting citizens.

“A strong commitment to public safety and a great quality of life go hand-in-hand,” City Manager Michael Spurgeon said.  “This new state-of-the-art replacement station will help our fire department better serve the citizens and businesses in Broken Arrow.  I appreciate the time and efforts the Fire Administration, Architect and Engineering staff put into designing such an awesome facility for our community.”

BAFD Firefighters and Emergency Medical Services personnel recently moved into the facility and are already enjoying their new accommodations.

“I couldn’t be more grateful to our City Council, the City Manager, and our Citizens for providing the funding and support to open this state-of-the-art facility,” Broken Arrow Fire Chief Jeremy Moore said.  “New Fire Station #7 will have twice as many apparatus bays and four times the living space as its predecessor.” 

Moore says it’s not just about the additional space, but the new station is also outfitted with modern-day equipment and safety and comfort features to ensure our most valuable resource, our firefighters, are taken care of extremely well.   

“As I look at where we’ve come, I am elated, but when I think about where we’re going, I am absolutely energized,” he said. 

Coweta-based Bravo Builders constructed the station at a cost of $3.7 million. The project is funded by the voter-approved 2014 and 2018 General Obligation bonds.

Read more
RSS
First960961962963965967968969Last

Theme picker

Upcoming Events

Theme picker

Sponsors

Fire Mechanics Section Board

Chair

Posted: Oct 21, 2015

Chair

Elliot Courage
North Whatcom Fire & Rescue
Read more

Vice Chair

Posted: Oct 21, 2015

Vice Chair

Mike Smith 
Pierce County Fire District #5
Read more

Secretary

Posted: Oct 21, 2015

Secretary

Greg Bach
South Snohomish County Fire & Rescue
Read more

Director #1

Posted: Oct 21, 2015

Director #1

Doug Jones
South Kitsap Fire & Rescue
Read more

Director #2

Posted: Oct 21, 2015

Director #2

Paul Spencer 
Fire Fleet Maintenance LLC
Read more

Director #3

Posted: Oct 21, 2015

Director #3

Jim Morris
Mountain View Fire Department
Read more

Director #4

Posted: Oct 21, 2015

Director #4

Arnie Kuchta

Clark County Fire District 6

Read more

Director #6

Posted: Oct 21, 2015

Director #6

Brett Annear
Kitsap County Fire District 18
Read more

Director #5

Posted: Oct 21, 2015

Director #5

Jay Jacks
Camano Island Fire & Rescue
Read more

Legislative Representative

Posted: Oct 21, 2015

Legislative Representative

TBD
TBD
Read more

Immediate Past Chair

Posted: Oct 20, 2015

Immediate Past Chair

Brian Fortner
Graham Fire & Rescue

Read more
RSS

Theme picker

2020 CAR SHOW