The groundbreaking ceremony was recently held for Ono Island (AL) Fire Station No. 4, reports gulfcoastnewstoday.com.
The 6,085-square-foot facility, designed by McCollough Architecture and to be constructed by M.W. Rogers Construction, will be built across the street from the current station. It’s scheduled for completion in April 2022.
The news digs are designed to withstand 175-mph wind and will include six bunk rooms, a private office, an emergency medical service room, two apparatus bays, and storage space.
The City of Orange Beach and Ono Island have a fire and EMS agreement due to the latter being outside the city limits, the report says. As part of the agreement, the city purchased a new engine and equipment with Ono Island repaying the cost over 10 years. The agreement also includes the Ono Authority constructing the new station.

Read more
- 312
- Article rating: No rating
Posted: Apr 26, 2021
Wareham (MA) Firefighters have begun training on a new, not-yet-in-service “brush-breaker” truck, reports wickedlocal.com.
The five-ton apparatus—which can carry 750 gallons of water and 25 gallons of foam—is a surplus Army vehicle and fire officials say it was provided at a “great savings” to the department.
The new truck will become Breaker 404 when it’s lettered.
Related Articles:
Wareham (MA) Firefighter Injured in Multi-Vehicle Crash Involving Fire Apparatus
Wareham (MA) Using Grant to Buy Fire Apparatus
Wareham, Onset (MA) Close Fire Stations to Public
Read more
- 288
- Article rating: No rating
Posted: Apr 26, 2021
Firefighters throughout the Omaha (NE) Fire Department will undergo training at Omaha Public Safety Training Center for the features and specs on three new E-ONE Engines purchased by the department, reports wowt.com.
All three were built from the ground up via specifications from by the department. Following training, the engines next week will be placed at:
• Station 3 (3126 S. 16th St.)
• Station 23 (9090 N. 30th St.)
• Station 52 (10727 Pacific St.)